The BSJFD is currently developing plans and budgets for a new station to replace the existing station #1. Our goal is to engage the community and develop a project that our community will support. The existing station no longer meets the needs of the department.  Please revisit this page often for updates. There is a Q&A section available below for those who have questions.

brewster3.png

Current Fire Station Conditions

Structural integrity and safety

The current facility shows significant signs of wear and tear, including cracks in the foundation and outdated electrical systems that no longer meet modern safety codes. These issues pose a risk to our personnel and daily operations.

Inadequate equipment storage space

Our growing fleet and equipment needs have outpaced the station's original design. Gear is stored in high-traffic areas, slowing down response times and creating hazardous conditions during emergency calls.

Lack of Proper Ventilation

The existing station lacks powered ventilation and there is no emergency vehicle exhaust purge system in the truck bays. This results in poor air quality throughout the resting and office areas, exposing our staff to diesel particulates and other airborne toxins on a daily basis.

Accessibility Issues

The existing station lacks an interior accessible route including no access to office areas and between vehicle bays. There are also no accessible toilets for staff or firefighters. The stairs are too steep and non-compliant and there is no ADA signage in the facility.

Lack of Training Areas

The current station lacks dedicated training space, forcing personnel to perform skill drills in active truck bays or shared administrative spaces. This creates safety hazards and limits the intensity and variety of training exercises essential for firefighter readiness and proficiency.

Design & Architectural Experience

Our team brings specialized knowledge in fire protection facility design, ensuring that every architectural decision prioritizes response efficiency, personnel safety, and long-term structural resilience while being as cost-effective as possible. 

Construction Management Experience

wall.jpeg

Since 2003, Hueber-Breuer's Division of Fire Protection Services has managed the construction of 22 fire stations totaling over $100 million in projects delivered “on time and under budget.”

Project Timeline & Milestones

PHASE 01: 2016-2019

Planning & Needs Assessment

PHASE 02: 2025

Community Outreach & Vote

PHASE 03: LATE 2025

First Referendum - $38 Million

PHASE 04: 2026 - 2027

Detailed Project Re-Development

Comprehensive evaluation of current station deficiencies and future operational requirements. Initial architectural feasibility studies completed.

Public informational forums and workshops. District referendum vote scheduled for September 9th to secure project approval.

Voters opposed this project by a vote of 477-377. Community feedback included concerns of overall project cost.

New project development team created with the goal to reduce size and cost of project. Expanded committee to include community members and local business leaders.

Proposed Fire Station Overview

The proposed new facility is designed to address critical safety gaps while providing the infrastructure necessary for modern emergency response and responder safety. Please use the button below to download a draft of the floorplans.

Key Benefits & Planned Facilities

brewster floorplan.png
  • Modern vehicle exhaust extraction systems for personnel health
  • Dedicated training and drill spaces
  • ADA-compliant accessibility throughout the entire facility
  • Expanded apparatus bays for safer equipment storage and maintenance
  • Integrated decontamination zones to prevent cross-contamination of dirty and clean areas
  • Consolidated administrative and operational work areas

DISTRICT VOICES

Community Q&A

Have questions about the project? Not sure how this project differs from the last proposed project? Please ask us and we are happy to clarify for you! If your question is not already listed, please use the form below to submit it to the district board. Typically, responses are posted within 24 hours.

Frequently asked questions